From: route@monster.com
Sent: Friday, April 08, 2016 12:13 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Tawn Wheeler Page 1 of 4 Experience:
UtilatechSalt Lake City, UT Jan 2014 –
Present Principal
Project Controls Engineer - Scheduler/Cost ·
Manage 33 projects totaling $85M
for Substation, Communication and Microwave projects assigned relating to
power substations, communications, relay and transmission stations. ·
Build and manage
detail and high level schedules using Primavera 6 v7. ·
Maintain, create and administer
coding, structures, baselines, resources within project activities. Schedules
consist of 80 to 300 activities. ·
Weekly status updates, baseline
change processes, analyze logic sequence, risks, run log reports and claim
digger analysis. ·
Create new templates and fragnet
schedules to accommodate each project and type of work, resources and
activities needed for projects. ·
Admin manager of Primavera
schedules, maintain coding, global and user controls with project specific
fields and codes. Manage, create new coding, structures, layouts, user
specific fields within global and user applications. Build global change
filters to analyze projects activity integrity and extrapolate specific user
data for reporting. Created and maintain audit processes and application for
schedules. ·
Manage Primavera Admin rights to
users, global access and database and system usability within team. ·
Manage and produce 25 Primavera
reports to upper management. Manage detailed resource loading schedules and
audit; analyze risks, thresholds and improving schedule performance. ·
Work with contractors in relation
to reviewing their schedules, importing and exporting schedules into master
schedule. Work with schedule of values, project plans, engineering reviews,
design changes, procurement and commissioning phases on projects. ·
Use of SAP for project costs,
budget tracking, monthly forecasts, accrual reporting and analysis. Build;
create user fields to manage project actuals and forecasting financial
modeling. Created financial audit controls checklist for financial modeling
analysis of the gross and net costs. ·
Manage project budgets, cost
estimates, change control, funding limits and increases within financial and
accounting budgets. ·
Interface with Engineering on
design changes and procurement items. ·
Update monthly forecasts at the
purchase order level on 21 projects. Maintain financial dash board models
with 21 projects. Analyze and give input on budget differences of forecast
threshold limits monthly. Review contractor’s schedule of values and SAP data
and accruals by PO and order number monthly to ensure all estimated actual
costs are captured accurately. ·
Create cost/financial metrics
models as needed to capture budget allocations and expenses. Analyze budget
is being spent to plan, use of Earned Value Management with costs and
schedule. ·
Maintain dashboard reports which
summarize project cost and schedule health of each project that I manage. ·
Direct support to two Project
Managers, in addition support Engineering, Directors and Managers with
project controls applications. ·
Backup up for two Project Managers
and direct the 21 projects when they are out of the office. Run project
meetings; write project plans, cost/schedule variance and budget analysis
narratives and explanations for upper management with PacifiCorp and Rocky
Mountain President, Vice Presidents and Directors. Chevron
/ Brahma Group Salt Lake City, UT Mar
2013 – Dec 2013 Consultant
Scheduler/Cost Engineer Projects Completed
·
Manage; create refinery schedules
for mechanical, civil and electrical projects at Chevron refinery plant in
Salt Lake City, UT for the upgraded Oil Skimmer project. ·
Create WBS, resource loaded
schedules, status updates and implement, analyze and assess risks. Create
cost estimates, load cost and budget into Primavera and manage costs and
budget in Timberline. ·
Financial analysis of actuals,
forecasting budget hours for project. ·
Use of Primavera P6 V7, Microsoft
Project, EVMS, and Access on projects. ·
Manage schedules, status updates,
cost estimates and procurement activities in schedule. ·
Work with project leads with
status of activities and reporting. ·
Managed budgets, schedule of
values with resource loaded schedules. ·
Built, analyzed financial data,
created dash board reports and models to capture estimated forecasted and
actual costs. ·
Created, maintained and managed
schedules, WBS, coding, resources, man power curves and budget/accounting
processes. ·
Managed project costs of $150M and
a schedule of 6500 activities. ·
Ran quantitative and qualitative
risk analysis reports with budget and schedule for the projects integrity
assessment. Kennecott/Rio
South Jordan,
UT Oct 2011 – Mar 2013 Consulting
Scheduler/Cost Engineer
Projects Completed · Manage
projects, cost and schedules for Cornerstone Stone projects which consisted
of North Rim Skarn, South Wall Facilities and Truck Shop Expansion. · Managed
budget of $250M and 8000 activity schedule. · Build
construction schedules, logic, procurement and commissioning phases. · Work
with contractors on drawings, CAD, engineering designs and planning controls,
· Procedures
and change control of budget and schedule. · Oversee
cost, budgets, funding and risk analysis, quantitative-qualitative analysis,
EVMS, cost estimates of project activities. · Review
engineering drawings, submittals to ensure accuracy of project design phase. · Work
with project leads with status of activities and reporting/Prism. · Assist
with project controls work and team efforts. · Attend
meetings, submit reports and scheduling updates. PAC
Energy / CH2MHill - HanfordRichland,
WA Mar 2009 - Oct 2011 Senior
Project Controls Engineer / Cost-Schedule
·
Develop; manage schedules for projects with the Department of Energy
(Richland, WA office) and Bechtel WTP projects. Support of High Level Waste
project, River Corridor and Tank Farm operations. · Support
DOE / Washington Group, Bechtel-CH2Mhill scope of work, work packages and
construction activities with D&D, ORP and WRP projects. Metrics,
schedules and reporting updates on closure activities. · Manage
projects, schedules, costs, budgets and funding of construction phases of
ERDF and waste treatment plant facilities. · Review
of REA's the baseline cost estimates and schedules using MII, P6 and
Pertmaster for project risks. Work with planners and maintenance projects,
getting status and updates relating to work performed. · Maintain
status, EVMS, POW, POD, project controls, procedures and policies. Create
schedules when needed. · Provide
schedule, risk quantitative and qualitative analysis, planning and controls,
reports for upper management. Maintain risk register logs relating to
projects work scope. · Manage
project scope changes and supervise construction building of remediation
structure projects and roadways. ·
Manage project budget, estimates and cost analysis for baseline of
departmental funding and schedule variances, activities. Analyze schedule and
cost claims of performance completed. · Update
and maintain earned value in relation to cost and schedule variance.
CH2M
Hill, Washington Group / Bechtel – INLIdaho Falls, ID Nov 1994-Feb 2009 Senior
Project Controls - Lead Scheduler/Cost Engineer
· Project
Controls Lead Scheduler/Cost engineer for chemical, energy, heavy
construction-Test Reactor Power area and nuclear waste projects. This
included the RH True Waste, High Level Waste, Farms, Sodium Bearing Waste,
ARP I, II Construction and Waste Treatment Plant. Use of Primavera 3 and 5
and also Microsoft Project in work applications. · Work
packages, POW, POD, metrics development and implementation. Worked with
drawings, equipment and facility walk downs. Status schedules with planners
and maintenance applications. · Worked
with construction contractors on engineering designs, drawings and specs in
relation to schedules. · Test
Reactor, D&D, operations buildings, roads, remediation projects and
energy applications. · Provide
schedule/cost, analysis planning and controls, reports for upper management. · Creation
of schedules, resource loading and cost analysis of projects for management. · Budget,
cost estimates and analysis for baseline of departmental funding and schedule
variances, activities. Analyze schedule and cost claims of performance
completed. · Supervised
safety meetings, kept safety records, maintained recordable are database and
activities. · Update
and maintain earned value in relation to cost and schedule variance. · Maintained
project schedule, cost and budgets · Ensure
schedule, resource loaded correctly. Status schedule with project managers,
managers and engineer's daily. Develop WBS, Baseline, Work Packages, Detailed
Work Plan, SAP, CPM, PMP, (EVMS) Earned Value Management Scheduling, and
Level 3, 4 and 5 schedule maintenance / crosswalk maintenance over lifecycle
of projects. Education:
B.S /
Finance - Minors: Engineering - Chemistry / IT
- Brigham Young University, Provo UT
Software: Primavera 6, Pertmaster, MII
Cost Estimating, Microsoft Word, Office, Oracle Financial, Access, SAP, Prism
Microsoft Project, Cobra, PassPort, Excel and PowerPoint. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|